Filter:   
Outage Type: Building Name: Date:

Outage Notice:

Repair
Edit
Outage Description: This chilled water outage to your building is required to make necessary repairs to the system. This may result in warmer building air conditioning temperatures. [JCI to perform maintenance on Chiller].
Time: 6/26/2017 8:00 AM -- 6/28/2017 11:00 PM
Building(s) Affected:

Repair
Edit
Outage Description: It is necessary to deenergize a High Voltage Feeder to effect repairs. [An Electrical outage is scheduled for your building to repair the electrical meter.].
Time: 6/26/2017 4:00 PM -- 6/26/2017 6:00 PM
Building(s) Affected:

Repair
Edit
Outage Description: This natural gas outage to your building is required to make necessary repairs to the system. This may result in colder building temperatures. [].
Time: 6/28/2017 7:30 AM -- 6/28/2017 4:00 PM
Building(s) Affected: