Filter:   
Outage Type: Building Name: Date:

Outage Notice:

Repair
Edit
Outage Description: This chilled water outage to your building is required to make necessary repairs to the system. This may result in warmer building air conditioning temperatures. [Air Handlers 5, 6 & 12 will be shut down.].
Time: 7/16/2018 9:00 AM -- 7/25/2018 4:00 PM
Building(s) Affected:

Construction
Edit
Outage Description: Chilled water outage see details in description below [Decoupler Installation for West Stadium].
Time: 7/23/2018 6:00 AM -- 7/28/2018 6:00 PM
Building(s) Affected:

Repair
Edit
Outage Description: This steam outage to your building is required to make necessary repairs to the system. This may result in colder builing temperatures. [Steam outage for New Chemical Engineering.].
Time: 7/24/2018 6:00 AM -- 7/24/2018 4:00 PM
Building(s) Affected:

Repair
Edit
Outage Description: This domestic water outage to your building is required to make necessary repairs to the system. Restrooms and drinking fountains are out of order for the stated outage time. [].
Time: 7/24/2018 6:00 AM -- 7/24/2018 7:30 AM
Building(s) Affected:

Repair
Edit
Outage Description: This natural gas outage to your building is required to make necessary repairs to the system. This may result in colder building temperatures. [High pressure gas shutdown].
Time: 7/27/2018 12:00 PM -- 7/27/2018 6:00 PM
Building(s) Affected: